- Home
- In Our Community
- Construction Projects
- Townsend Boulevard Water Improvement Project
Townsend Boulevard Water Improvement Project
Estimated Dates & Work Schedule
Anticipated End Date: 2026-01-31
Work Schedule: Monday - Saturday, 7 a.m. - 7 p.m.*
*Dates and times are highly subject to change.
Crews will not work on Thanksgiving or Christmas holidays.
Project Objective
As part of the Small Diameter Pipe Replacement Program to modernize hundreds of miles of JEA’s existing potable water distribution system, JEA crews are working in your area to replace and upgrade portions of the water lines on Townsend Boulevard from Alderman Road to Lone Star Road.
These pipes are approaching the end of their useful service lives and are being proactively replaced to ensure the reliability of the JEA water system in the area. This work will include the replacement of the existing water main and water services (to the existing meters near the property lines) along the project route. Once complete, this project will improve water pressure and enhance the overall quality and reliability of water service in the area.
Construction Areas
Work will primarily occur in City of Jacksonville rights-of-way and easements.
Construction Conditions
JEA’s contractor, CMG Pipelines, will first install a temporary above-ground water bypass system to ensure continuous service to our customers and provide space for the new pipeline. These pipes will be placed along City of Jacksonville rights-of-way and utility easements.
Once the bypass piping has been installed, tested, and cleared for use, the contractor will begin installing the new water main using stitch-moling as the method of construction. This approach requires less trenching, is less disruptive to neighborhoods than the traditional open-cut method, and typically results in a shorter overall project duration.
Restoration of the Project Area
Restoration of the project area will begin typically begin 2-3 weeks after the project has been completed. Any existing grass, sprinklers, pavement, curb, gutter, driveways and/or sidewalks affected during construction will be returned to their pre-construction condition.
Temporary Overnight Road Closure (10/29 - 10/30)
For the safety of our crews and the public, crews will be required to temporarily close and detour traffic on Townsend Boulevard from Lone Star Road to Alderman Road while work is completed. This work is being completed overnight to minimize disruption during peak traffic periods. Please see the work area map below.
Anticipated Start
Date: October 29 at 8:00 p.m.*
Estimated
Completion Date: October 30 at 6:00 a.m.*
*Dates and times are
highly subject to change.
Project Area Map

Contact
-
If you have any questions about the Townsend Boulevard Water Improvement Project, please contact JEA Project Outreach at (904) 665-7500 or email us at projectoutreach@jea.com.