Bid Openings and Results

JEA provides electric, water and sewer services in parts of Clay, Duval, Nassau and St Johns counties. We are always improving our facilities to ensure we meet the needs of our customers. Results on current projects out for bid can be found here as well as bid award information for past projects.

2017-08-08 at 2 : 00 p.m.


  • 112-17 Engineering Services for Walnut Street 60" Trunk Sewer Replacement
  • 123-17 JEA Headquarters Office Facility Owner's Representative
  • Results

2017-08-01 at 2 : 00 p.m.


  • 071-17 Engineering Services for Nassau Regional Water Reclamation Facility Projects - Phase 2
  • 102-17 Purchase and Implementation of JEA Backup and Recovery Solution and Associated Maintenance and Support
  • 108-17 Engineering Services for the District II Primary Clarifier #2 and #3 Rehabilitation Project
  • Results

2017-07-25 at 2 : 00 p.m.


  • 093-17 Security Services for JEA
  • 113-17 Copier Services and Printer Maintenance for JEA
  • 115-17 Greenland Energy Center Tank Additions (2 Fuel & 1 Demineralized Water)
  • 117-17 FY18 Electric Equipment Replacements and Expansion - Four (4) 55' Bucket & Two (2) 55' Bucket Truck/Material Handlers
  • Results

2017-07-18 at 2 : 00 p.m.


  • 062-17 Substation Transformer Supply for JEA
  • Results

2017-07-11 at 2 : 00 p.m.


  • 103-17 Construction Services for Main Street (WTP) Well Number 15
  • 104-17 Water/Wastewater General Construction Services for JEA
  • 105-17 William Burgess - SR 200 to Harts Rd - 16" Sewer Force Main and Reclaim Water Main
  • 107-17 Review Water Main Extension Phase 1
  • Results

2017-06-27 at 2 : 00 p.m.


  • 106-17 Water Main Construction Services - Yellow Bluff Rd. - Marshland Dr. to Tisons Bluff Rd.
  • 109-17 Professional Services for Decommissioning Management SJRPP
  • Results

2017-06-20 at 2 : 00 p.m.


  • 040-17 Inspection and Maintenance of Fire Extinguishers
  • 085-17 T-Line to Busch Drive Transmission Force Main
  • 088-17 Joint Agency Fuel Supply Products, Fuel Cards, and Related Services
  • 096-17 Construction Services for Woodmere Water Treatment Plant (WTP) Well #3 and Nassau Regional WTP #3
  • Results

2017-06-06 at 2 : 00 p.m.


  • 090-17 Construction Services for Arlington Water Treatment Plant High Service Pump
  • 101-17 Supply of Submersible Pump Seals for JEA's Pump Shop
  • Results

2017-05-23 at 2 : 00 p.m.


  • 083-17 Engineering Services for the Buckman - 5301 Buffalo Ave - Class III/IV Pump Station Rehabilitation Project
  • 084-17 Engineering Services for 6217 Wilson Road - Wastewater Pumping Station Upgrades
  • 085-17 T-Line to Bush Drive Transmission Force Main
  • 091-17 Engineering Services for Gate Pkwy - Glen Kernan to T-Line - New - Trans - Reclaimed Water
  • 099-17 Nassau Regional WTP Emergency Storage Improvements
  • 100-16 Pole Attachment Permit Processing for JEA
  • Results

2017-05-16 at 2 : 00 p.m.


  • 045-17 Switchgear Breaker Testing Services for JEA
  • 071-17 Engineering Services for Nassau Regional Water Reclamation Facility Projects
  • Results

2017-05-09 at 2 : 00 p.m.


  • 058-17  Disturbed Concrete Restoration (JSEB Sheltered Market)
  • 082-17  Design, Permitting and Construction Management of Septic Tank Phase-Out Projects 
  • 086-17  Engineering Services for the Lakeshore Water Treatment Plant (WTP) Reservoir and Wellhead No. 2 Rehabilitation 
  • Results

2017-05-02 at 2 : 00 p.m.


 

  • 055-17 Barricade Services for JEA and City of Jacksonville
  • 073-17 Construction Services for the Ortega River Crossing Circuit 666 Structures #31 thru #28 and Circuit 669 Structures #2 and #2A Pole Replacement 
  • 075-17 Supply of Pole Line Hardware for JEA Inventory Stock
  • 078-17 General Construction Services for JEA
  • 081-17 Janitorial Services Open Market 
  • 089-17 Engineering Services for the Cecil Commerce Center WTP - New Water Storage Reservoir and High Service Pump Improvements 
  • 094-17 Buckman Wastewater Treatment Plant Class AA Pellet Removal Program 
  • 095-17 Engineering Services for the Nassau Regional WTP Well No. 3 
  • Results

2017-04-25 at 2 : 00 p.m.


  • 007-17 Supply of Water & Wastewater Materials for JEA Inventory Stock
  • Results

2017-04-18 at 2 : 00 p.m.


  • 026-17 Bulk Glycerin Supply and Delivery
  • 049-17 NGS Discharge and SJRPP Intake Basin Construction Services
  • 069-17 Storm Restoration Services - Tree and Vegetation Clearing Along Transmission and Distribution Access and Rights of Way
  • 076-17 PSSC Office Renovation Project
  • 077-17 Construction Services for Main St - Sara Drive to Noah Rd - Force Main Project
  • 092-17 JEA Generator Rental Agreement - Revision
  • Results

2017-04-11 at 2 : 00 p.m.


  • 044-17 Employee Benefits Consulting Services
  • 064-17 Fleet Services GPS and Telematics
  • 068-17 Storm Restoration Food Services
  • Results

2017-04-04 at 2 : 00 p.m.


  • 060-17 Engineering Services for the 100-46 T-Line - JTB to Town Center Parkway Force Main 
  • 066-17 Decommissioning and Disposal of Scrap Electrical Equipment 
  • 070-17 Engineering Services for the Main Street WTP 36" Water Transmission Main and 30" Raw Water Main 
  • Results

2017-03-28 at 2 : 00 p.m.


  • 008-17 Buckman Wastewater Treatment Plant Class AA Pellet Removal Program
  • 016-17 Engineering Services for the Dinsmore 230/26kV Substation
  • 063-17 Purchase and Installation of Replacement Generators
  • Results

2017-03-21 at 2 : 00 p.m.


  • 057-17 Wellhead Rehabilitation
  • 061-17 Engineering Services for 5104 118th St., Wastewater Pumping Station Upgrades
  • 065-17 Arc Flash Studies
  • Results

2017-03-14 at 2 : 00 p.m.


  • 059-17 Landfill Services- Debris to be Delivered by JEA to Landfill site
  • 074-17 Purchase of All New 2017 Model Year, Two (2) 3 Ton 4x2 Extended Cab 55' Bucket Trucks, Three (3) 3 Ton 4x2 Extended Cab 55' Bucket Trucks/Material Handlers, Four (4) 3 Ton 4x2 Extended Cab 47" Digger Derrick Trucks, and One (1) 5 Ton 6x4 47' Derrick Truck.
  • Results

2017-03-07 at 2 : 00 p.m.


  • 072-17 Purchase of One (1) New 2017 Model 3-Ton 4x2 Vacuum Jet Truck and One (1) New 2017 Model 5-Ton 6x4 Vacuum Jet Truck
  • Results

2017-02-28 at 2 : 00 p.m.


  • 035-17 Supply of Two (2) 50 MVA Transformers to JEA
  • 047-17 Construction for West Nassau Regional Water Treatment Plant Phase IB-WTP and Wellhead Mechanical
  • Results

2017-02-21 at 2 : 00 p.m.


  • 038-17 Supply of Residential Water Meters for JEA Inventory Stock - (Correction to Year)
  • Results

2017-02-21 at 2 : 00 p.m.


  • 038-17 Supply of Residential Water Meters for JEA Inventory Stock
  • 046-17 Engineering Services for the Water Treatment Facility Onsite Reclaimed Water Storage Tank and Offsite Reclaimed Water Booster Station
  • 053-17 Purchase and Installation of Generators for JEA Lift Station
  • Results

2017-02-14 at 2 : 00 p.m.


  • 041-17 Engineering Services for the Kennedy Switchgear and Transformer Replacement Project
  • 048-17 Business Excellence Consulting Services
  • 050-17 Engineering Services for the Buckman WRF Blower System Improvements
  • 051-17 Consulting Services for Architecture and Execution Plan of Enterprise Information Management for JEA's Enterprise Asset Management Data
  • 052-17 Purchase of Nine (9) New 2017 Model Year Three Quarter Ton Pickup Trucks and Utility Bodies
  • 054-17 Purchase of Ten (10) New 2017 Model Year Three Quarter Ton Vans and One (1) New 2017 Model Year Mini Utility Van
  • Results

2017-01-31 at 2 : 00 p.m.


  • 015-17 Manufacturing and Installation of Relay Panels for JEA Substations and Generating Plants
  • 036-17 Supply of Three Phase Distribution Transformers for JEA Inventory Stock
  • 042-17 Purchase of Four (4) New 2017 Model Year Mini Excavators
  • Results

2017-01-24 at 2 : 00 p.m.


  • 115-16 Bulk Liquid Polymer Emulsion Supply and Delivery
  • Results

2017-01-17 at 2 : 00 p.m.


  • 025-17 Purchase of Twenty-Seven (27) New 2017 Model One Ton Utility Trucks
  • Results

2017-01-10 at 2 : 00 p.m.


  • 017-17 Supply of Primary Underground Cable for JEA Inventory Stock
  • 020-17 Bulk Liquid Sodium Hypochlorite Supply
  • 029-17 SR13 to San Marco Water & Force Main Replacement
  • 031-17 Purchase of Seventeen (17) New 2017 Model Year Half Ton 4 x 2  Pickup Trucks
  • 033-17 Memorial Park Force Main Replacement - Phase 2
  • Results

2016-12-29 at 2 : 00 p.m.


  • 019-17 SJRPP Janitorial Services
  • Results

2016-12-20 at 2 : 00 p.m.


  • 010-17  MCDuff 13/4kV Substation Rebuild
  • 018-17 Automation, Protection and Control General Engineering Services for JEA Generating Plants and Substations
  • 021-17 Blowdown Piping Replacement Project
  • 027-17 JEA Marietta Water Treatment Plant High Service Pump Upgrades
  • Results

2016-12-13 at 2 : 00 p.m.


  • 023-17 Fleet Services Tire Repair and Maintenance
  • 024-17 Cisco Network Equipment Purchase
  • 033-17 Construction Services for Memorial Park Force Main Replacement
  • 129-16 Commonwealth Service Center Parking and Drainage Improvement
  • Results

2016-12-06 at 2 : 00 p.m.


  • 013-17 West Nassau Regional WTP High Service Pump and Motor Replacement
  • 014-17 Pest Control Services
  • 041-16 Electrical Generators
  • Results

2016-11-22 at 2 : 00 p.m.


  • 003-17 Ridenour Water Treatment Plant Administration /Operations Building Interior Renovations
  • Results

2016-11-15 at 2 : 00 p.m.


  • 003-17 Ridenour Water Treatment Plant (WTP) Administration / Operations Building Interior Renovations
  • 006-17 Bulk Caustic Soda - Supply and Delivery
  • 009-17 Bulk Anhydrous and Aqua Ammonia - Supply and Delivery
  • Results

2016-11-01 at 2 : 00 p.m.


  • 001-17 Construction Services for Dunn Ave - Key Haven Blvd to Lem Turner Rd - Force Main Project
  • 002-17 Submersible Pump Repair Services
  • 011-17 JEA Fleet Services Heavy Duty Maintenance and Repair
  • Results

2016-10-25 at 2 : 00 p.m.


  • 128-16 JEA / SJRPP Electric Plant Motor Repair Services
  • Results


2016-10-18 at 2 : 00 p.m.


  • 004-17 General Services for Electric Distribution
  • Results

2016-10-04 at 2 : 00 p.m.


  • 076-16 SmartNet Support and Maintenance of Jea's Cisco Infrastructure
  • 114-16 Electric Cost of Service and Rate Design Consulting Services
  • Results

2016-09-29 at 2 : 00 p.m.


  • 124-16 Alachua 24 Inch Transmission Force Main Replacement - Alachua MPS to Wilson Blvd
  • Results

2016-09-27 at 2 : 00 p.m.


  • 084-16 Actuarial Services for SJRPP System Employee's Retirement Plan
  • 125-16 Electric Meter Material for JEA Inventory Stock
  • 127-16 Engineering Services for the West Grid Lenox to Timuquana Force Main and Pump Station Improvements
  • Results


2016-09-20 at 2 : 00 p.m.


  • 080-16 JEA Northside Generating Station (NSGS) Chemical Waste Treatment System (CWTS) Clean-Up
  • 110-16 Independent Audit Services for JEA
  • 126-16 Pivot Bracket Assemblies for St. Johns River Power Park (SJRPP)  Inventory
  • Results

2016-09-13 at 2 : 00 p.m.


  • 119-16 JEA Fleet Services Aerial Equipment Maintenance and Repair
  • 121-16 SJRPP Burner Deck Modifications
  • Results

2016-08-30 at 2 : 00 p.m.


  • 112-16 SJRPP Fuel Supply Service
  • 117-16 JEA Fleet Services Heavy Duty Maintenance and Repair
  • 120-16 JEA Fleet Services Off-Road Equipment Maintenance and Repair
  • Results

2016-08-23 at 2 : 00 p.m.


  • 111-16 Electric Plant Valve Repair Services
  • Results

2016-08-16 at 2 : 00 p.m.


  • 092-16 Concrete Manholes, Pads Switch Pits, and General Products for JEA Inventory Stock
  • 104-16 Main Street Water Treatment Plant
  • 116-16 JEA Fleet Services Light Duty Maintenance and Repair
  • 118-16 JEA Fleet Services Medium Duty Maintenance and Repair
  • Results

2016-08-09 at 2 : 00 p.m.


  • 097-16 Engineering Services for the US-1 South Water Re-Pump Facility
  • 101-16 Philip Hwy - Emerson to Spring Park Road 24" FM Replacement
  • 106-16 Construction for West Nassau Regional WTP - Phase 1B - Well Drilling and Raw Water Piping
  • 108-16 Civil Service Exam Development
  • Results

2016-08-02 at 2 : 00 p.m.


  • 093-16 Electric Plant Industrial Cleaning Services
  • 099-16 Water Purification Treatment Evaluation and Pilot Testing
  • 109-16 Landscape Chemical Weed Control
  • Results

2016-07-26 at 2 : 00 p.m.


  • 103-16 Engineering Services for District II - 10800 Key Haven Blvd Class III/IV Project
  • 105-16 Engineering Services for the Southwest - 4881 Timuquana Rd, Class III/IV Pump Station Upgrades
  • 113-16 Lime Rock & Crushed Stone Supply Services
  • Results

2016-07-19 at 2 : 00 p.m.


  • 060-16 Graphic Services
  • 094-16 Facilities Landscaping Services - Sheltered
  • 098-16 Engineering Services for the Main Street Water Treatment Plant - Well No 15
  • Results

2016-07-12 at 2 : 00 p.m.


  • 067-16  Industrial Painting services for St. Johns River Power Park (SJRPP)
  • 075-16 Pearl Street Service Station Paving and Drainage Improvements
  • 102-16 Engineering Services for Nocatee Re-Pump Facility Augmentation Well
  • Results

2016-07-07 at 2 : 00 p.m.


  • 071-16 Construction Services for 2304 McMillan Wastewater Class III/IV Pumping Station Rehabilitation
  • 075-16 Pearl Street Service Station Paving and Drainage Improvements (Phase I)
  • 079-16 Facilities Landscape Maintenance
  • Results

2016-06-28 at 2 : 00 p.m.


  • 081-16 Arlington East Water Reclamation Facility Secondary Clarifier
  • Results

2016-06-21 at 2 : 00 p.m.


  • 070-16 General Engineering Services for Water, Wastewater, and Reclaimed Water Projects
  • 073-16 Construction for Northwest Regional Water Treatment Plant (WTP)
  • 074-16 Manhole and Wetwell, Cementious and Fiberglass Structural Rehabilitation Services (Revised)
  • Results

2016-06-14 at 2 : 00 p.m.


  • 069-16 Neighborhood Energy Efficiency Program Services
  • 090-16 Recycling, Solid Waste Hauling and Disposal Services
  • 091-16 Peterson Tract, Miller Tract Reforestation Preparation
  • Results

2016-06-07 at 2 : 00 p.m.


  • 074-16  Manhole and Wetwell, Cementitious and Fiberglass Structural Rehabilitation Services
  • 077-16  Ponte Vedra Water Main and Force Main Replacement
  • 085-16  The Point Meadows 230/26KV Substation and Transmission Circuits 946/956
  • 086-16  Engineering Services for Buckman Disinfection System Replacement
  • 087-16  Nocatee North and Bartram Reclaimed Water Storage Expansion
  • 089-16  Overhead Electrical Distribution/Transmission Facilites Unit Price Construction & Maintance and Pole Removal
  • Results

2016-06-02 at 2 : 00 p.m.


  • 078-16 Janitorial Services - (JSEB) Sheltered Market - Substations and Lift Stations
  • Results

2016-06-02 at 2 : 00 p.m.


  • 033-16 Bill Print and Presentment Serices
  • 041-16 Electrical Generator
  • 056-16 Bulk Sulfuric Acid - Supply and Delivery
  • 057-16 Bulk Caustic Soda - Supply and Delivery
  • 082-16 Engineering Services for Southwest WRF Screenings Conveyance System and Grit Removal System
  • Results

2016-05-17 at 2 : 00 p.m.


  • 058-16 Bulk Anhydrous and Aqua Ammonia - Supply and Delivery
  • Results

2016-05-10 at 2 : 00 p.m.


  • 033-16 Bill Print and Presentment Services
  • 049-16 Janitorial Services - Open Market
  • 068-16 Peterson Tract, Miller Track Reforestation Preparation
  • 113-15 Structures and Materials Packager for JEA Substation and Transmission Projects
  • Results

2016-05-03 at 2 : 00 p.m.


  • 040-16 Electrical Conduit & Fittings for JEA Inventory Stock Solicitation
  • 062-16 Manhole and Wetwell Rehabilitation Services
  • 064-16 Mandarin Water reclamation Facility Expansion Tank and UV System Improvements
  • Results

2016-04-26 at 2 : 00 p.m.


  • 048-16 Purchase and Installation of an Energy Management Situational Awareness Video Display System (VDS) Including Warranty, Maintenance and Support
  • 050-16 Disturbed Asphalt Restoration Services
  • 063-16 Buchman Water Reclamation Facility Aeration Improvement 
  • 065-16 JEA/SJRPP (HR) Supplemental Staffing Services
  • 066-16 Residential Customer Contact Center (RCCC) Supplemental Staffing Services
  • 072-16 Supply of Pumps for McMillan Pump Station
  • Results

2016-04-19 at 2 : 00 p.m.


  • 020-16 Environmental Air Emissions Testing Services
  • 043-16 Purchase and Implementation of JEA Utility Tracker Portal Tool and Associated Maintenance and Hosting (SaaS)
  • 059-16 Engineering Services for Otter Run Water Plant Renewal and Replacement
  • 061-16 Woodmere WTP Well No. 3 and Storage Tank Replacement
  • Results

2016-04-07 at 2 : 00 p.m.


  • Janitorial Services - (JSEB) Sheltered Market - Generating Plants
  • Results

2016-04-05 at 2 : 00 p.m.


  • 054-16 Streetlight Conversion Unit Price Contract
  • 055-16 Electric Plant Lagging and Insulation Services
  • Results

2016-03-29 at 2 : 00 p.m.


  • 034-16 SJRPP to Purchase Wheel Loader and Associated Warranty, Maintenance and Training
  • 041-16 Electrical Generators
  • 047-16 Southeast WTP High Service Pump Upgrades
  • 051-16 Roosevelt Boulevard Water Main Improvements
  • Results

2016-03-22 at 2 : 00 p.m.


  • 046-16 Main Street Well 6A Head Assembly and Associated Pipeline Project
  • 053-16 Arlington Water Treatment Plant High Service Pump Replacement
  • Results

2016-03-15 at 2 : 00 p.m.


  • 036-16 Electric Plant Fire Protection System Inspection, Testing & Maintenance
  • 039-16 Streetlight Materials for JEA Inventory Stock
  • Results

2016-03-08 at 2 : 00 p.m.


  • 042-16 Buckman New Administrative Building
  • 045-16 Pole Mounted Transformers for JEA Inventory Stock
  • Results

2016-03-01 at 2 : 00 p.m.


  • 052-16 Kings Road - Cleveland St to Darrow Rd, S.
  • 109-15 Testing Administration Outsourcing
  • Results

2016-02-23 at 2 : 00 p.m.


  • 029-16 Printing Services for JEA Brand Management
  • 033-16 RFQ for Bill Print and Presentment
  • 037-16 Engineering Services for District II Pumping Stations and Flow Rerouting
  • Results

2016-02-09 at 2 : 00 p.m.


  • 028-16 Phase 2 JEA's Blacks Ford Water Reclamation Facility Phase 4 Expansion Project
  • Results

2016-02-02 at 2 : 00 p.m.


  • 021-16 Roofing Installation and Repair Services for JEA
  • 035-16 Southside Gas Insulated Switchgear Equipment Replacement
  • 027-16 Electronic Payments
  • Results

2016-01-12 at 2 : 00 p.m.



2016-01-19 at 2 : 00 p.m.


  • 030-16 JEA Greenland Water Treatment Plant (WTP) Improvement Project
  • Results

2016-01-12 at 2 : 00 p.m.


  • 016-16 Key Haven PS to Harts Rd PS-FM Replacement
  • 025-16 Supply of Pebble Quick Lime
  • 027-16 Electronic Payments
  • 032-16 Construction for Main Street WTP Well No. 13
  • Results

2015-12-17 at 2 : 00 p.m.


  • 119-15 Main Street WTP - Well 14 - Wellhead Assembly and Raw Water Pipeline
  • 018-16 General Engineering Services for Pipeline Projects and Studies Less Than 24" Pipe Diameter - Phase 2
  • Results

2015-12-15 at 2 : 00 p.m.


  • 001-16 JEA.com Responsive Design
  • Results

2015-12-10 at 2 : 00 p.m.


  • 028-16 JEA's Black Ford Water Reclamation Facility Phase 4 Expansion Project
  • Results

2015-12-08 at 2 : 00 p.m.


  • 031-16 JEA Headquarters Upgrade Study
  • 019-16 General Engineering Services for Pipeline Projects and Studies Greater than or Equal to 24" Pipe Diameter (Phase 2)
  • Results

2015-12-01 at 2 : 00 p.m.


  • 024-16 Pivot Bracket Assemblies for St. Johns River Power Park
  • 013-16 Pipe Bursting Construction Services
  • 014-16 Cure in Place Pipe Construction Services
  • 015-16 Restoration of Concrete Paved Areas - South/East Section
  • Results

2015-11-24 at 2 : 00 p.m.


  • 012-16 Norwood WTP Reservoir Rehabilitation
  • Results

2015-11-17 at 2 : 00 p.m.


  • 011-16 Property and Casualty Insurance Brokerage Services
  • 010-16 Brandy Branch Generating Stations T1 Addition, Construction
  • 018-16 General Engineering Services for Pipeline Projects and Studies Less than 24" Pipe Diameter (Phase 1)
  • Results

2015-11-12 at 2 : 00 p.m.


  • 019-16 General Engineering Service for Pipeline Projects and Studies Greater than or Equal to 24" Pipe Diameter - Phase 1
  • Results

2015-11-10 at 2 : 00 p.m.


  • 098-15 Repair, Installation and Testing of Fire Alarm and Sprinkler Systems
  • 097-15 Repair and Installation of Industrial Automatic Gate and Door Systems
  • 110-15 Pre-Employment Psychological Assessments and Company-Wide Cognitive Ability and Behavioral Assessments
  • 007-16 Padmount Distribution Transformers for JEA Inventory Stock
  • Results

2015-11-05 at 2 : 00 p.m.



2015-11-03 at 2 : 00 p.m.


  • 023-16 Greenland Water Treatment Plant (WTP) Sulfide Removal System - Phase II
  • 100-15 Repair and Installation of Video Surveillance Systems
  • Results

2015-10-27 at 2 : 00 p.m.


  • 099-15 Repair and Installation of Access Control Systems
  • 107-15 Power Plant Equipment Painting for St. Johns River Power Park (SJRPP)
  • 118-15 Fairfax WTP High Service Pump Rehabilitation
  • 002-16 Manatee Monitoring Services
  • 003-16 Buckman Water Reclamation Facility (WRF) Clarifier Access & Walkways Rehabilitation Services
  • 009-16 Ortega 26kV/4kV Substation Rebuild
  • Results

2015-10-20 at 2 : 00 p.m.


  • 006-16 JEA Headquarters Upgrade Study
  • 115-15 Commercial & Residential Energy Efficiency Program Management
  • 116-15 Brandy Branch T-1 Addition
  • 005-16 Fleet Fueling Services
  • 008-16 Fleet Tire Services
  • Results

2015-10-06 at 2 : 00 p.m.


  • 104-15 Industrial & Laboratory Gas Supply
  • 114-15 Fuel Tank Cleaning, Treatment and Testing Services
  • 091-15 Matting Services Contract
  • 096-15 Customer Alerts and Notifications
  • Results

2015-09-29 at 2 : 00 p.m.


  • 095-15 State Government Relations Consulting Services
  • Results

2015-09-22 at 2 : 00 p.m.


  • 073-15 Greenland Water Treatment Plant (WTP) Sulfide Removal System
  • 083-15 General Engineering Services for Combined Heat and Power Generation (CHP)
  • 108-15 Jaxport 26/13kV Substation Installation
  • 112-15 Main Street Well No. 6A Well Construction
  • Results

2015-09-15 at 2 : 00 p.m.


  • 077-15 Engineering Services for Design of the William Burgess-Harts Rd to SR200 16" Force Main and Reclaim Water Main
  • 103-15 Hydrographic Surveys for JEA and SJRPP Facilities
  • 106-15 Rosselle 26kV/4kV Substation Rebuild
  • Results

2015-09-03 at 2 : 00 p.m.


  • 067-15 Engineering Services for 4511 Spring Park Road Pump Station Rehabilitation
  • 117-15 Mandarin WRF Bio Filter Bed Replacement, Headworks Rehab, and Bar Screen Replacement/Grit System Removal
  • Results

2015-08-18 at 2 : 00 p.m.


  • 090-15 Construction for Northwest Water Treatment Plant (WTP) Production Wells 1 and 2
  • Results

2015-08-11 at 2 : 00 p.m.


  • 102-15 Engineering Services for Design of the T-Line to Busch Drive
  • Results

2015-08-04 at 2 : 00 p.m.


  • 065-15 Bill Print and Presentment
  • 081-15 Engineering Services for West Nassau Regional WTP Phase 1B
  • Results

2015-07-28 at 2 : 00 p.m.


  • 022-15 Underground Distribution Facilities & Manhole Ductbank Unit Price Construction & Maintenance
  • 088-15 Burner Deck Ventilation and Fan Upgrade at SJRPP
  • 087-15 Engineering Services for 100-57 Dunn Ave - Key Haven Blvd to Lem Turner Rd - Force Main
  • 055-15 Lock Box Payments
  • 056-15 Electronic Payments
  • 057-15 Walk-In Payments
  • Results

2015-07-21 at 2 : 00 p.m.


  • 071-15 Alachua Avenue Class IV Sewage Pumping Station Rehabilitation
  • 082-15 St. Johns North Water Treatment Plant (WTP) Packed Tower Replacement
  • 089-15 Materials for the Commercial Water Meter Change Out Project
  • 084-15 Dredging Services for SJRPP
  • 041-15 Program Manager Services for the Large Diameter Pipe Evaluation and Replacement Program
  • 072-15 Engineering Services for Marietta Water Treatment Plant High Service Pump Upgrades
  • 069-15 Ecological and Water Resource, Constraint Evaluation and Support Services
  • Results

2015-07-14 at 2 : 00 p.m.


  • 062-15 JEA Kennedy Generating Station Creosote Site Resource Conservation and Recovery Act (RCRA) Corrective Measures Implementation
  • 078-15 Engineering Services for Design of the Main St to Pulaski Rd-Trans-FM Project
  • Results

2015-07-07 at 2 : 00 p.m.


  • 074-15 Engineering Services for Nocatee North Reclaimed Water Storage Expansion
  • Results

2015-06-30 at 2 : 00 p.m.


  • 052-15 Timuquana Road at Ortega River - Force Main (FM) Replacement
  • 086-15 Pest Control Services
  • 080-15 JEA Northside Generating Station Unit 1 Spray Dryer Absorber (SDA) Cone Replacement
  • 075-15 Mandarin WRF Bio Filter Bed Replacement, Headworks Rehab, and Bar Screen Replacement/Grit System Removal
  • 066-15 Supplemental Staffing - Oracle Database Administrator (DBA) and Oracle E-Business Suite (EBS) Developer
  • 070-15 Hydrologic Modeling, Water Resource Management & CUP Support Services
  • Results

2015-06-23 at 2 : 00 p.m.


  • 048-15 Tools and Related Items for JEA Storeroom Stock
  • 060-15 NGS Boiler Refractory Repair Services
  • Results

2015-06-16 at 2 : 00 p.m.


  • 085-15 Owners Engineering Representative and Construction Inspector for the South Shores Second Subaqueous Force Main Crossing
  • Results

2015-06-11 at 2 : 00 p.m.


  • 076-15 Northside Generating Station Discharge Basin Wall Replacement
  • Results

2015-06-11 at 12 : 00 p.m.



2015-06-09 at 2 : 00 p.m.


  • 063-15 Main Street WTP - Well 14, Well Construction
  • Results

2015-06-02 at 2 : 00 p.m.


  • 058-15 Underground Fiber Optic Cable Construction, Repair, and Maintenance
  • 059-15 Engineering Services for Design of the T-Line to Busch Drive
  • Results

2015-05-19 at 2 : 00 p.m.


  • 054-15 Ponce De Leon Water Treatment Plant Pump Building and Reservoir Replacement
  • Results

2015-05-12 at 2 : 00 p.m.


  • 049-15 Supply of One (1) Substation Transformer
  • 050-15 Electric Plan HVAC Maintenance and Repair Services
  • Results

2015-05-05 at 2 : 00 p.m.


  • 008-15 2015 JEA Northside Generating Station (NSGS) Chemical Waste Treatment System (CWTS) Clean Up
  • 064-15 Materials for the Commercial Water Meter Change Out Project
  • Results

2015-04-28 at 2 : 00 p.m.


  • 051-15 Repair and Maintenance of Generators
  • Results

2015-04-14 at 2 : 00 p.m.


  • 009-15 SJRPP and JEA Power Generation and JEA Water/Wastewater (W/WW) Hoist, Crane, and Chainfall and Come-Along Inspection, Maintenance, Repair and Certification Services
  • 047-15 Engineering Services for 2304 McMillan Wastewater Pumping Station Rehabilitiation
  • Results

2015-04-10 at 2 : 00 p.m.



2015-04-07 at 2 : 00 p.m.


  • 029-15 Design Build Services for the District II - Reclaim Water Main-Broward River Crossing
  • 044-15 Engineering Services for the Argyle Forest Boulevard Pump Station Replacement
  • Results

2015-03-24 at 2 : 00 p.m.


  • 002-15 Restoration of Concrete Paved Areas - South/East Section
  • 027-15 Design Build Services for the South Shores Second Sub-Aqueous Force Main Crossing - Part II
  • 038-15 Engineering Services for Design of the Huffman Blvd-Tulip Cir N to St Johns Bluff Rd-FM-S
  • 040-15 Brandy Branch Generating Station Cooling Tower Fill Material Replacement Project
  • 046-15 Engineering Services for Design of the Phillip Hwy - Emerson to Spring Park Rd-FM-S
  • Results

2015-03-17 at 2 : 00 p.m.


  • 035-15 Kennedy Generating Station CT 7 Silencer Replacement
  • 043-15 Purchase of a New McAfee (SIEM) Appliances and 3 Years Support
  • 045-15 Large Water Meter Replacement Services
  • Results

2015-03-10 at 2 : 00 p.m.


  • 031-15Services for Influent Pump Station Grease and Debris Removal at the Mandarin Water Reclamation Facility
  • 037-15 Repair of Automatic Transfer Switches
  • Results

2015-03-03 at 2 : 00 p.m.


  • 042-15 Manholes and Boxes for JEA Storeroom Stock
  • Results

2015-02-24 at 2 : 00 p.m.


  • 017-15 Engineering Services for Fairfax and McDuff Treatment Plant (WTP) Wellfield Rehabilitation
  • Results

2015-02-10 at 2 : 00 p.m.


  • 033-15 Purchase of Two (2) New MVA, 26.4/13.2 KV Power Transformers for the New Jaxport Substation & One (1) New 8.6 MVA, 13.2/4.16 KV Power Transformer for the McDuff Substation Rebuild Project
  • 036-15 Warehouse Equipment Repair and Maintenance Services
  • Results

2015-01-27 at 2 : 00 p.m.


  • 034-15 Industrial Pipes. Valves and Fittings for JEA and SJRPP Storeroom Stock
  • 029-15 Design Build Services for the District II – Reclaim Water Main – Broward River Crossing
  • 030-15 Engineering Services for Main Street Water Treatment Plant (WTP) Well 8A
  • Results

2015-01-13 at 2 : 00 p.m.


  • 021-15 Cecil Commerce Center North 230/26kV Substation and Transmission Circuits 944/957 Interconnect
  • 024-15 Engineering Services for Lane Ave. – Alachua Master Pump Station (MPS) to Wilson Blvd.
  • 027-15 Design Build Services for the South Shores Second SubAqueous Force Main Crossing
  • Results

2015-01-06 at 2 : 00 p.m.


  • 028-15 Repair and Installation of Security Fencing
  • 032-15 Cisco Phone Modernization Equipment and First Year Smartnet Maintenance
  • 101-14 Biosolids Management Study
  • Results

2014-12-16 at 2 : 00 p.m.


  • 003-15 Southside Generating Station, Dolphin Berthing Removal
  • 012-15 Industrial Hygiene Consulting and Testing Services
  • 019-15 Direct Support of VMware Licenses
  • 020-15 JEA and SJRPP Non-Destructive Examination (NDE) Services
  • 023-15 Northside Generating Station, Fuel Oil Tank #5 Demolition
  • 025-15 Banking Services
  • Results

2014-12-09 at 2 : 00 p.m.


  • 104-14 Southside Gas Insulated Switchgear (GIS) Bay Controller and Digital Breaker Controller (DBC) Replacement
  • 108-15 State and Union Sewer Improvement Project
  • 026-15 Cisco Equipment Main Distribution Switches LAN Refresh for Remote JEA Sites
  • Results

2014-12-02 at 2 : 00 p.m.


  • 111-14 SJRPP Absorber Tower Coating Services
  • 014-15 St. Johns River Power Park (SJRPP) Boiler Welding Services
  • Results

2014-11-25 at 2 : 00 p.m.


  • 011-15 Purchase of Two (2) 8.6 MVA, 26.4/4.16 KV Power Transformers for the Rosselle Substation Rebuild
  • Results

2014-11-18 at 2 : 00 p.m.


  • 001-15 SJRPP and JEA Scaffolding Services
  • 004-15 St. John’s River Power Park (SJRPP) Burner Deck and Natural Gas Ventilation Modification Project
  • 013-15 SJRPP Sale and Removal of Byproducts
  • Results

2014-11-04 at 2 : 00 p.m.


  • 116-14 Roofing Installation and Repair for JEA and St. Johns River Power Park (SJRPP)
  • 010-15 St. John’s River Power Park Traction Passenger Elevator Maintenance
  • 005-15 Southeast Regional Reclaimed Water Management Strategy
  • Results

2014-10-28 at 2 : 00 p.m.


  • 006-15 Special Waste Handling Services for Non-Hazardous Waste/Hazardous Waste
  • 114-14 Engineering Services for Northwest Regional WTP
  • Results

2014-10-21 at 2 : 00 p.m.


  • 078-14 JEA Timber Sale
  • 115-14 Asbestos and Lead Abatement Services
  • Results

2014-10-14 at 2 : 00 p.m.


  • 112-14 SJRPP Railroad Three Year Inspection, Maintenance, and Repair Program
  • 090-14 General Engineering Services for Electric Protection and Controls Projects
  • Results

2014-10-07 at 2 : 00 p.m.


  • 058-14 The Purchase of JEA's Southside Generating Station Site
  • 032-14 Circuit 821 and 822/853 Structure Rebuild Phase II
  • 094-14 Purchase of Arc-Resistant, Metal-Clad Switchgear
  • Results

2014-09-30 at 2 : 00 p.m.


  • 105-14 Supply of Indirect Reheater Coils SJRPP
  • 110-14 Lease of Two Off Road Dump Trucks for By-Product Disposal at St. Johns River Power Park (SJRPP)
  • Results

2014-09-23 at 2 : 00 p.m.


  • 109-14 Wastewater Treatment Glycerin Supplier
  • 103-14 Managed Services for Helpdesk and PC Support IT Services Technicians
  • Results

2014-09-16 at 2 : 00 p.m.


  • 108-14 Water Meters for Inventory Stock
  • Results

Step into JEA's Outage Center
}
/uploadedImages/Images/SiteIntercept_Ad_Outage_Reporting.jpg
Need to report or monitor an outage? Do it right here.

Report and Monitor Outages Now!