- Engineering and Construction
- Water and Wastewater Development
Water and Wastewater Development
Payment
- JEA Water Pre-Service counter: 21 W Church Street, 1st Floor of Customer Service Building
- JEA.com
- Check
- Cash
- Credit Card
Availability Requests
- Single family homes have a flow of 350 gpd
- All other projects-flow can be calculated upon:
- Fixture count: 13.9 gpd per fixture unit Determine fixture units using the following work sheet:
https://www.jea.com/Engineering_and_Construction/Water_and_Wastewater_Development/Self-Service_Center/Capacity_Fee_Calculator_-_Fixture_Count/ - F.A.C. Rule 64E-6.008 found here:
https://www.flrules.org/gateway/RuleNo.asp?ID=64E-6.008
- Fixture count: 13.9 gpd per fixture unit Determine fixture units using the following work sheet:
- Please make the project name the address of your home or business, with the business name included
- Examples:
- 123 Broad Street
- 123 Main Street-Panda Express
- Examples:
Include all applicable RE#’s in request
Self or your name
- JEA Availability Team
- 904-665-7710
- availabilityreq@jea.com
Main extensions will require plans submitted to the JEA Development Team by your engineer. Your engineer will walk you through the development process. Once plans are approved your contractor will install the main extension and you will dedicate the work to JEA to maintain.
Development Projects
- Download hydrant flow test application at: https://www.jea.com/Engineering_and_Construction/Water_and_Wastewater_Development/Self-Service_Center/Applications
- Submit application at payment to water pre-service counter-address on application
In most instances you will receive a response within 10 business days of your request being submitted. If you would like to request the status of your request you can email availabilityreq@jea.com
If any of the following criteria are the reason for the new letter request, please email us to request updated letter: availabilityreq@jea.com
- Expired
- Address change
- Flow Change
- Always verify your sewer service location prior to abandoning your septic tank
- When you can’t find your sewer service lateral, JEA can do this for you
- JEA will send a crew out and camera the line, identify where your sewer service lateral is, and paint its location on the ground. If no sewer service is found you will be notified
- Submit Wastewater Locate Application to the water pre-service counter with payment, application found here or at counter: https://www.jea.com/Engineering_and_Construction/Water_and_Wastewater_Development/Self-Service_Center/Applications
- Locate is marked generally within 10 business days of processing the application and payment
- As instructed in availability letter, email fmconnections@jea.com
- Include your project availability number
Low pressure sewer-alternative sewer option when gravity sewer flow cannot be obtained to serve a residential customer.
- https://www.jea.com/Engineering_and_Construction/Water_and_Wastewater_Development/Self-Service_Center/Development_Project_Status/
- You need you enter your availability number to see the status of your project
- Alternative Connection Committee
- Made up of W/WW and Planning Directors
- Meet to review requests for alternative water and sewer option requests
- For requests to be put on the ACC agenda please email the request, plans and reasoning/justification for request to wsedevprojrequests@jea.com
- You will be contacted by a member of the JEA development team to discuss your request
- You will be notified of the planned meeting date
- You will be provided a letter outlining the ACC’s response to your request within 5 business days following the meeting
No, this is an internal meeting only
After your project has been accepted it will be released for meters
- After your as-builts have been approved, your water and/or sewer permits have been cleared AND you have provided the JEA development team with a complete project acceptance package
- Checklist and applicable documents can be found here: https://www.jea.com/engineering_and_construction/water_and_wastewater_development/forms_and_procedures/
- All project infrastructure must be installed
- As-builts need to be approved, an approval letter will be provide
- Permit COC applications can then be submitted with the as-built approval letter to JEA to be cleared
- JEA does not issue temporary water meters
- Apply for a fire hydrant meter after agreeing to the policy found here: https://www.jea.com/Engineering_and_Construction/Water_and_Wastewater_Development/Self-Service_Center/Applications
JEA Real Estate Team: https://www.jea.com/about/real_estate_services/
Outlined in Section 2.9 of JEA’s Design Guidelines found here: https://www.jea.com/engineering_and_construction/water_and_wastewater_development/reference_materials/
Outlined in Section 1.3 of JEA’s Design Guidelines found here: https://www.jea.com/engineering_and_construction/water_and_wastewater_development/reference_materials/
- Pre-Design Meeting: Prefer the project engineer be at the meeting
- Pre-Con Meeting: Contractor, Engineer, Owner’s Representative
Outlined in Section 1.3 of JEA’s Design Guidelines found here: https://www.jea.com/engineering_and_construction/water_and_wastewater_development/reference_materials/
- After plans have been approved
- Before meter will be installed on residential projects and multi-meter commercial project
- Before project will be accepted on single meter commercial projects
Related Links
- JEA Development Process Workshop Presentation-January 2020
-
Water and Wastewater Standards
JEA Water and Wastewater Standards is responsible for approval of materials and the design standards used in the construction of its water and wastewater infrastructure.
-
Forms and Procedures
Applicable forms, procedures and checklists needed to ensure efficient project management throughout JEA's Development process.