Sign in

Community Landing Page Banner

Request an As-Built Drawing Form

Request Date: March 26, 2017

During construction of JEA electric and water/sewer infrastructure, modifications are sometimes made to the original design phase as a result of various factors such as permitting, physical obstacles, available inventory, electrical loads, and previously existing assets. As-Built drawings represent the final detailed 'blueprints' as to how the infrastructure was actually installed during the construction phase.

NOTE: Requests will be returned within 5 business days.