Capacity Fee Estimator - Average Daily Flow

Prior to initial connection to JEA's water and wastewater systems, customers are required to pay a water and/or wastewater plant and line extension growth capacity charge. Charges are determined by either the meter size or projected flow (consumption) as submitted by an engineer.

Gallons Per Day:

Total Fixture Unit Water Capacity Fee Sewer Capacity Fee Total Fees
0 $0.00 $0.00 $0.00

Reset

Request A Drawing

}
/uploadedImages/Images/SiteIntercept_Ad_RequestAsBuiltDrawing.jpg
Sometimes you need As-Built drawings to represent the final detailed 'blueprints' as to how amd infrastructure was actually installed during the construction phase.

Make a Request