|
Part of the administration of the National Pretreatment Program is identifying and permitting facilities that meet program criteria. Facilities that are identified can be permitted in several ways.
- Industries that discharge process wastes fall under Industrial User Discharge Permits (IUDP).
- Companies which haul domestic and portable toilet waste to Buckman WWTF are given a Waste Hauler Discharge Permit.
- Under certain circumstances groundwater which is produced from either construction or low level clean up and does not meet surface water criteria can apply for a Groundwater Discharge Permit to discharge these waters to the sanitary sewer.
If you are not certain if you require a IUDP please fill out the Industrial Pretreatment survey. If you are applying for a permit there is a $250.00 permit fee payable to JEA.
Please return surveys and applications to:
JEA
Regulatory Conformance, T-8
21 West Church Street
Jacksonville, Florida 32202
Do I need a permit?
Permit Applications
Application Packet Forms (to be downloaded and reviewed when applying for any Industrial Pretreatment permit)
Any publication marked with an icon, is in the Adobe© PDF format and requires a viewer, which is downloadable from Adobe©.
|